City of portland 2008 stormwater manual






















excavation). The manual is in accordance with the City of Portland’s Title 10 Erosion and Sediment Control Regulations. Title 10 and this Erosion Control Manual apply to all ground-disturbing activities, whether or not a permit is required, unless such activities are otherwise exempted by Portland City Code. City of Portland Stormwater Management Manual—Month Year A-5 Appendix A: Stormwater Design Methodologies, Santa Barbara Urban Hydrograph Method 1 by the ” storm, or a [Volume of the basin/Volume of the runoff] 2 Vb/Vr ratio of 2. 3 Based on an updated review of the City’s rainfall, the City is increasing the water.  · The updated manual will be required for all project designs submitted after April 2, Skip to Main Content View Text-Only. The City of Portland, Oregon. Welcome to the official web site of the City of Portland, Oregon. General Information: E-mail: cityinfo@www.doorway.ru SW 4th Avenue, Room , Portland, OR


The city issued revised versions in , and Project designers have the option of using the Stormwater Management Manual or the manual until April. After April 2, , designers must use the manual. The manual, and the version, are available for download at www.doorway.ru Free compact disc versions are available at the Development Services Center, SW 4th Avenue in Portland or by calling For more information contact. The manual identifies best management practices for how to build, operate, and treat wastewater and stormwater to prevent pollution and spills. The manual covers site-specific activities like waste storage, loading and unloading, exterior storage and processing, and dewatering. The manual sets City policy and design requirements for stormwater management on all development, redevelopment, and improvement projects on both public and private property in Portland.


Rationale for the Selection of Stormwater Management Requirements. and the City of Portland and the municipalities in the Clean Water Services district. Soakaway is a term commonly seen in European stormwater management literature, City of Portland Bureau of Environmental Services, , City of Portland. 1 de mar. de The Lake Oswego Stormwater Management Manual is a living policy document H-1 City of Portland BES Stormwater Manual () Plant List.

0コメント

  • 1000 / 1000